CROMWELL HYDROPOWER STATION

BARN ENERGY LIMITED

KEY FACTS

Commissioning date: Q4 2018

 

Location: River Trent, nr Newark

 

Turbine: Triple Kaplan Turbine

 

Maximum output: 1800kW

 

Annual generation: 8,500,000 kWh

 

Catchment area: 8,232 km2

 

Maximum turbine flow: 80 cumecs

 

Maximum head: 3.33 m

 

 

 

A HIDDEN GEM

 

  • Horbury Broad Cut Weir is a hidden gem, an oasis of biodiverse tranquillity to the south of the town on the banks of the Calder

  • If/when permitted, Horbury hydropower station will comprise a 100kW axial turbine which will protect fish and eels by a custom-designed inlet screen

  • If/when commissioned, it will:

    • generate around 550,000 units (kWh) per annum…

    • enough electricity to take around 150 average UK homes off the grid almost in perpetuity

  • Twitter - Black Circle
  • LinkedIn - Black Circle
  • Facebook - Black Circle

© 2015 by Barn Energy